Lakeridge Dam
Key Takeaway
Lakeridge Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 27 ft (taller than 65.9% in GA) |
| Dam Length | 255 ft |
| Dam Type | Earth |
| Max Storage | 40 acre-ft |
| Normal Storage | 26 acre-ft |
| Surface Area | 3 acres |
| NID ID | GA04957 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Rockdale County
Local Government
Nearby Dams
Lakefield Commons Dam
Rockdale, GA
High Hazard 33 ftWalker Lake Dam
Rockdale, GA
High Hazard 30 ftCoursey Lake Dam
Rockdale, GA
Unknown 20 ftJosephs Lake Dam
Rockdale, GA
Low Hazard 22 ftPiney Wood Shores Lake Dam
Rockdale, GA
Low Hazard 23 ftArenzo Lake Dam
Rockdale, GA
Low Hazard 34 ftCowan Lake Dam
Rockdale, GA
High Hazard 33 ftTwin Lakes (Lower) Dam
Rockdale, GA
Low Hazard 20 ftFrequently Asked Questions
What is the hazard classification of Lakeridge Dam?
Lakeridge Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lakeridge Dam?
Lakeridge Dam is owned by Rockdale County (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Lakeridge Dam?
Lakeridge Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Lakeridge Dam?
Lakeridge Dam has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Lakeridge Dam last inspected?
Lakeridge Dam was last inspected on September 1, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.