Lake Agape
Key Takeaway
Lake Agape is classified as low hazard in Tennessee. It was completed in 1970 and is 56 years old. Its primary use is recreation.
Physical Details
| Dam Length | 200 ft |
| Dam Type | Earth |
| Max Storage | 53 acre-ft |
| Normal Storage | 71 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 1970 (56 years old) |
| NID ID | TN13902 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
POLK COUNTY BAPTIST ASSOCIATION
Private
Nearby Dams
Mckamy Dam
Polk, TN
Low Hazard 26 ftOcoee No. 1 Dam
Polk, TN
High Hazard 127 ftDelano Mill Pond
Polk, TN
Significant HazardOcoee No. 2 Forebay Dam
Polk, TN
Low Hazard 24 ftRiver Pointe Lake
Bradley, TN
Low HazardHoskins
Bradley, TN
Significant HazardHuber Effluent Pond #5
McMinn, TN
Significant HazardDogwood Estates
Bradley, TN
High HazardFrequently Asked Questions
What is the hazard classification of Lake Agape?
Lake Agape is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lake Agape?
Lake Agape is owned by POLK COUNTY BAPTIST ASSOCIATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Lake Agape built?
Lake Agape was completed in 1970, making it 56 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Lake Agape?
Lake Agape serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Lake Agape last inspected?
Lake Agape was last inspected on July 20, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.