Kern Diversion
Key Takeaway
Kern Diversion is classified as low hazard in California. It was completed in 1906 and is 120 years old. Its primary use is hydroelectric.
Physical Details
| Dam Height | 29 ft (taller than 29% in CA) |
| Dam Length | 204 ft |
| Dam Type | Concrete |
| Max Storage | 247 acre-ft |
| Normal Storage | 135 acre-ft |
| Surface Area | 27 acres |
| Max Discharge | 6,500 cfs |
| Year Completed | 1906 (120 years old) |
| NID ID | CA00429 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Southern California Edison Company
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Kern Diversion?
Kern Diversion is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Kern Diversion?
Kern Diversion is owned by Southern California Edison Company (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Kern Diversion built?
Kern Diversion was completed in 1906, making it 120 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Kern Diversion?
Kern Diversion serves the following purposes: Hydroelectric. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Kern Diversion?
Kern Diversion has a dam height of 29 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Kern Diversion last inspected?
Kern Diversion was last inspected on September 22, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.