John Rainsford Jr Dam

TR-HORN CREEK· Edgefield, South Carolina· Built 1997· 25 ft tall
Low Hazard Fish And Wildlife Pond Private

Key Takeaway

John Rainsford Jr Dam is classified as low hazard in South Carolina. It was completed in 1997 and is 29 years old. Its primary use is fish and wildlife pond.

Physical Details

Dam Height 25 ft (taller than 62.5% in SC)
Max Storage35 acre-ft
Normal Storage24 acre-ft
Surface Area3 acres
Year Completed1997 (29 years old)
NID IDSC02742

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: August 3, 2017
State Regulated: Yes
Regulatory Agency: SC DHEC

Ownership

J BRANNON AND SARA L ROWLAND

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of John Rainsford Jr Dam?

John Rainsford Jr Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates John Rainsford Jr Dam?

John Rainsford Jr Dam is owned by J BRANNON AND SARA L ROWLAND (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was John Rainsford Jr Dam built?

John Rainsford Jr Dam was completed in 1997, making it 29 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of John Rainsford Jr Dam?

John Rainsford Jr Dam serves the following purposes: Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is John Rainsford Jr Dam?

John Rainsford Jr Dam has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was John Rainsford Jr Dam last inspected?

John Rainsford Jr Dam was last inspected on August 3, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.