Jim Ned Creek WS SCS Site 6 Dam
Key Takeaway
Jim Ned Creek WS SCS Site 6 Dam is classified as low hazard in Texas. It was completed in 1962 and is 64 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 34 ft (taller than 76% in TX) |
| Dam Length | 1,080 ft |
| Dam Type | Earth |
| Max Storage | 1.0K acre-ft |
| Normal Storage | 50 acre-ft |
| Surface Area | 0 acres |
| Drainage Area | 0 sq mi |
| Year Completed | 1962 (64 years old) |
| NID ID | TX02237 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CENTRAL COLORADO SWCD;COLEMAN COUNTY
Local Government
Nearby Dams
Jim Ned Creek WS SCS Site 7 Dam
Coleman, TX
Low Hazard 36 ftJim Ned Creek WS SCS Site 5 Dam
Coleman, TX
Low Hazard 30 ftJim Ned Creek WS SCS Site 25 Dam
Coleman, TX
Significant Hazard 43 ftJackson Brothers Dam No 2
Coleman, TX
Low Hazard 29 ftJim Ned Creek WS SCS Site 8 Dam
Coleman, TX
Low Hazard 34 ftKnox Dam No 3
Coleman, TX
Low Hazard 26 ftKnox Dam No 2
Coleman, TX
Low Hazard 22 ftJim Ned Creek WS SCS Site 24 Dam
Coleman, TX
Low Hazard 54 ftFrequently Asked Questions
What is the hazard classification of Jim Ned Creek WS SCS Site 6 Dam?
Jim Ned Creek WS SCS Site 6 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Jim Ned Creek WS SCS Site 6 Dam?
Jim Ned Creek WS SCS Site 6 Dam is owned by CENTRAL COLORADO SWCD;COLEMAN COUNTY (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Jim Ned Creek WS SCS Site 6 Dam built?
Jim Ned Creek WS SCS Site 6 Dam was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Jim Ned Creek WS SCS Site 6 Dam?
Jim Ned Creek WS SCS Site 6 Dam serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond, Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Jim Ned Creek WS SCS Site 6 Dam?
Jim Ned Creek WS SCS Site 6 Dam has a dam height of 34 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.