Jackson-Mill Ck WCD Dam 7
Key Takeaway
Jackson-Mill Ck WCD Dam 7 is classified as significant hazard in South Carolina. It was completed in 1973 and is 53 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 54 ft (taller than 97.5% in SC) |
| Max Storage | 4.8K acre-ft |
| Normal Storage | 2.8K acre-ft |
| Surface Area | 192 acres |
| Year Completed | 1973 (53 years old) |
| NID ID | SC01206 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TOWN OF WINNSBORO
Local Government
Nearby Dams
Winnsboro Reservoir Dam
Fairfield, SC
Low Hazard 28 ftJackson-Mill Ck WCD Dam 2
Fairfield, SC
Low Hazard 38 ftCharles Jeffcoat Dam
Fairfield, SC
Low Hazard 23 ftJackson-Mill Cr WCD Dam 8
Fairfield, SC
Low Hazard 32 ftCathcart Pond Dam
Fairfield, SC
Low Hazard 24 ftEstes Farms Dam
Fairfield, SC
Low Hazard 27 ftJackson-Mill Cr WCD Dam 1
Fairfield, SC
Low Hazard 37 ftMartha Ladd Dam
Fairfield, SC
Low Hazard 20 ftFrequently Asked Questions
What is the hazard classification of Jackson-Mill Ck WCD Dam 7?
Jackson-Mill Ck WCD Dam 7 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Jackson-Mill Ck WCD Dam 7?
Jackson-Mill Ck WCD Dam 7 is owned by TOWN OF WINNSBORO (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Jackson-Mill Ck WCD Dam 7 built?
Jackson-Mill Ck WCD Dam 7 was completed in 1973, making it 53 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Jackson-Mill Ck WCD Dam 7?
Jackson-Mill Ck WCD Dam 7 serves the following purposes: Flood Risk Reduction, Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Jackson-Mill Ck WCD Dam 7?
Jackson-Mill Ck WCD Dam 7 has a dam height of 54 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Jackson-Mill Ck WCD Dam 7 last inspected?
Jackson-Mill Ck WCD Dam 7 was last inspected on January 11, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.