Jackson J
Key Takeaway
Jackson J is classified as low hazard in Oklahoma. It was completed in 1964 and is 62 years old. Its primary use is other.
Physical Details
| Dam Height | 22 ft (taller than 19.9% in OK) |
| Dam Length | 500 ft |
| Dam Type | Earth |
| Max Storage | 80 acre-ft |
| Normal Storage | 40 acre-ft |
| Max Discharge | 1,228 cfs |
| Year Completed | 1964 (62 years old) |
| NID ID | OK13220 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
RHONDA J SCOGGIN
Private
Nearby Dams
Oknoname 30230
Cleveland, OK
Low Hazard 13 ftAl Salyer
Cleveland, OK
Low Hazard 22 ftBell Mere
Cleveland, OK
Low Hazard 15 ftOknoname 027005
Cleveland, OK
Low Hazard 26 ftPage James A
Cleveland, OK
Low Hazard 22 ftRose Raymond L
Cleveland, OK
Low Hazard 20 ftLondon Tom
Cleveland, OK
Low Hazard 25 ftDahlgrin Lake
Cleveland, OK
Low Hazard 28 ftFrequently Asked Questions
What is the hazard classification of Jackson J?
Jackson J is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Jackson J?
Jackson J is owned by RHONDA J SCOGGIN (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Jackson J built?
Jackson J was completed in 1964, making it 62 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Jackson J?
Jackson J serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Jackson J?
Jackson J has a dam height of 22 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Jackson J last inspected?
Jackson J was last inspected on February 5, 2001. Inspection dates indicate when a formal review occurred, not the results of that inspection.