Izac Lake Dam
Key Takeaway
Izac Lake Dam is classified as low hazard in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 35 ft (taller than 80% in VA) |
| Dam Length | 875 ft |
| Dam Type | Earth |
| Max Storage | 1.2K acre-ft |
| Normal Storage | 830 acre-ft |
| Surface Area | 55 acres |
| Drainage Area | 3 sq mi |
| NID ID | VA109022 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Shenandoah Resort Community Assoc., Inc.
Private
Nearby Dams
Nininger Dam
Louisa, VA
Unknown 20 ftBoswell Tavern Dam
Louisa, VA
Unknown 27 ftNolting Dam
Louisa, VA
Unknown 17 ftSouth Anna Dam #3
Louisa, VA
High Hazard 33 ftWest Pond @ Shellhorn Dam
Louisa, VA
Unknown 20 ftGordonsville Dam
Louisa, VA
High Hazard 42 ftMittleman Dam
Louisa, VA
Unknown 22 ftGrassdale Dam
Louisa, VA
Unknown 23 ftFrequently Asked Questions
What is the hazard classification of Izac Lake Dam?
Izac Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Izac Lake Dam?
Izac Lake Dam is owned by Shenandoah Resort Community Assoc., Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Izac Lake Dam?
Izac Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Izac Lake Dam?
Izac Lake Dam has a dam height of 35 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Izac Lake Dam last inspected?
Izac Lake Dam was last inspected on October 9, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.