Intercity Wastewater Treatment(Cell 2)
Key Takeaway
Intercity Wastewater Treatment(Cell 2) is classified as low hazard in Wyoming. It was completed in 1990 and is 36 years old. Its primary use is other.
Physical Details
| Dam Height | 10 ft (taller than 3.3% in WY) |
| Dam Length | 3,200 ft |
| Dam Type | Earth |
| Max Storage | 0 acre-ft |
| Normal Storage | 529 acre-ft |
| Surface Area | 39 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1990 (36 years old) |
| NID ID | WY02257 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WEST SIDE WATER AND SEWER DISTRICT
Public Utility
Nearby Dams
Intercity Wastewater Treatment(Cell 1)
Sweetwater, WY
Low Hazard 10 ftIntercity Wastewater Treatment(Cell 3)
Sweetwater, WY
Low Hazard 10 ftChevron Gypsum
Sweetwater, WY
Low Hazard 53 ftKilldeer Wetland Pond
Sweetwater, WY
Low Hazard 11 ftSolid Waste Disposal Cell C
Sweetwater, WY
Low Hazard 18 ftRaw Water Reservoir
Sweetwater, WY
Significant Hazard 38 ftChevron Clearwater
Sweetwater, WY
Low Hazard 50 ftFrequently Asked Questions
What is the hazard classification of Intercity Wastewater Treatment(Cell 2)?
Intercity Wastewater Treatment(Cell 2) is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Intercity Wastewater Treatment(Cell 2)?
Intercity Wastewater Treatment(Cell 2) is owned by WEST SIDE WATER AND SEWER DISTRICT (Public Utility). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Intercity Wastewater Treatment(Cell 2) built?
Intercity Wastewater Treatment(Cell 2) was completed in 1990, making it 36 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Intercity Wastewater Treatment(Cell 2)?
Intercity Wastewater Treatment(Cell 2) serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Intercity Wastewater Treatment(Cell 2)?
Intercity Wastewater Treatment(Cell 2) has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Intercity Wastewater Treatment(Cell 2) last inspected?
Intercity Wastewater Treatment(Cell 2) was last inspected on June 27, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.