Inabinet Pond Dam
Key Takeaway
Inabinet Pond Dam is classified as low hazard in South Carolina. Its primary use is recreation.
Physical Details
| Dam Height | 16 ft (taller than 28.8% in SC) |
| Max Storage | 55 acre-ft |
| Normal Storage | 31 acre-ft |
| Surface Area | 6 acres |
| NID ID | SC02516 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
DANIEL AND BONNIE BOLIN
Private
Nearby Dams
Williams Pond Dam
Calhoun, SC
Low Hazard 19 ftStrawberry Pond Dam
Calhoun, SC
Low Hazard 19 ftMorefield Pond Dam
Calhoun, SC
Low Hazard 18 ftShannon Pond Dam
Calhoun, SC
Low Hazard 14 ftFalls Pond Dam
Calhoun, SC
Significant Hazard 20 ftRast Pond Dam
Calhoun, SC
Significant Hazard 19 ftJoe Phillips Pond Dam
Lexington, SC
Low Hazard 11 ftLayseth Mill Pond Dam
Orangeburg, SC
Significant Hazard 14 ftFrequently Asked Questions
What is the hazard classification of Inabinet Pond Dam?
Inabinet Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Inabinet Pond Dam?
Inabinet Pond Dam is owned by DANIEL AND BONNIE BOLIN (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Inabinet Pond Dam?
Inabinet Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Inabinet Pond Dam?
Inabinet Pond Dam has a dam height of 16 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Inabinet Pond Dam last inspected?
Inabinet Pond Dam was last inspected on March 20, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.