Hunter Mill Estates Regional Pond D-52/25
Key Takeaway
Hunter Mill Estates Regional Pond D-52/25 is classified as low hazard in Virginia. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 31 ft (taller than 71.8% in VA) |
| Dam Length | 300 ft |
| Dam Type | Earth |
| Max Storage | 82 acre-ft |
| Drainage Area | 1 sq mi |
| NID ID | VA059037 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Fairfax County Board of Supervisors
Local Government
Nearby Dams
Lake Fairfax Dam
Fairfax, VA
High Hazard 32 ftLake Audubon Dam
Fairfax, VA
High Hazard 46 ftLake Thoreau Dam
Fairfax, VA
High Hazard 56 ftWolf Trap Farm Pond Dam
Fairfax, VA
Low Hazard 7 ftLake Anne Dam
Fairfax, VA
High Hazard 47 ftCarrington Regional Dam
Fairfax, VA
High Hazard 25 ftLake Newport Dam
Fairfax, VA
High Hazard 32 ftPulte Mclean Swm Pond Dam
Fairfax, VA
High Hazard 17 ftFrequently Asked Questions
What is the hazard classification of Hunter Mill Estates Regional Pond D-52/25?
Hunter Mill Estates Regional Pond D-52/25 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hunter Mill Estates Regional Pond D-52/25?
Hunter Mill Estates Regional Pond D-52/25 is owned by Fairfax County Board of Supervisors (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Hunter Mill Estates Regional Pond D-52/25?
Hunter Mill Estates Regional Pond D-52/25 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Hunter Mill Estates Regional Pond D-52/25?
Hunter Mill Estates Regional Pond D-52/25 has a dam height of 31 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Hunter Mill Estates Regional Pond D-52/25 last inspected?
Hunter Mill Estates Regional Pond D-52/25 was last inspected on September 29, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.