Hunt Country Dam
Key Takeaway
Hunt Country Dam is classified as low hazard in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 36 ft (taller than 82% in VA) |
| Dam Length | 380 ft |
| Dam Type | Earth |
| Max Storage | 96 acre-ft |
| Normal Storage | 73 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 0 sq mi |
| NID ID | VA003189 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Wingate Homeowner Association
Private
Nearby Dams
Shelford Farm Dam
Albemarle, VA
Unknown 23 ftFr Farm Dam
Albemarle, VA
Unknown 47 ftMt. Amos Dam
Albemarle, VA
Unknown 25 ftIvy Creek Dam # 1
Albemarle, VA
Unknown 29 ftFlordon Dam
Albemarle, VA
Unknown 30 ftIvy Farm Dam
Albemarle, VA
Unknown 27 ftClover Dam
Albemarle, VA
Significant Hazard 24 ftFarmington Dam
Albemarle, VA
Unknown 30 ftFrequently Asked Questions
What is the hazard classification of Hunt Country Dam?
Hunt Country Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hunt Country Dam?
Hunt Country Dam is owned by Wingate Homeowner Association (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Hunt Country Dam?
Hunt Country Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Hunt Country Dam?
Hunt Country Dam has a dam height of 36 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Hunt Country Dam last inspected?
Hunt Country Dam was last inspected on June 5, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.