Howard Lake Dam
Key Takeaway
Howard Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 7 ft (taller than 0.2% in GA) |
| Dam Length | 1,085 ft |
| Dam Type | Earth |
| Max Storage | 136 acre-ft |
| Normal Storage | 73 acre-ft |
| Surface Area | 29 acres |
| NID ID | GA04674 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Howard Family Farm
Private
Nearby Dams
Mapp and Campbell Pond Dam
Screven, GA
Low Hazard 18 ftBarrett Street Dam
Bulloch, GA
Low Hazard 18 ftMilburne Lake Dam
Jenkins, GA
Low Hazard 15 ftBerger Pond Dam
Screven, GA
Low Hazard 17 ftNewton Lake Dam
Jenkins, GA
Low Hazard 18 ftZeagler Irrigation Pond Dam
Screven, GA
Low Hazard 15 ftPierce Pond Dam
Screven, GA
Low Hazard 13 ftJacobs Lake Dam
Screven, GA
Unknown 19 ftFrequently Asked Questions
What is the hazard classification of Howard Lake Dam?
Howard Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Howard Lake Dam?
Howard Lake Dam is owned by Howard Family Farm (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Howard Lake Dam?
Howard Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Howard Lake Dam?
Howard Lake Dam has a dam height of 7 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Howard Lake Dam last inspected?
Howard Lake Dam was last inspected on August 6, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.