Hideaway Pond Dam
Key Takeaway
Hideaway Pond Dam is classified as low hazard in Virginia. It was completed in 1983 and is 43 years old. Its primary use is recreation.
Physical Details
| Dam Height | 12 ft (taller than 6% in VA) |
| Dam Length | 765 ft |
| Dam Type | Earth |
| Max Storage | 182 acre-ft |
| Normal Storage | 64 acre-ft |
| Surface Area | 15 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 89 cfs |
| Year Completed | 1983 (43 years old) |
| NID ID | VA099004 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
DOD USN
Federal Government
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Hideaway Pond Dam?
Hideaway Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hideaway Pond Dam?
Hideaway Pond Dam is owned by DOD USN (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Hideaway Pond Dam built?
Hideaway Pond Dam was completed in 1983, making it 43 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Hideaway Pond Dam?
Hideaway Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Hideaway Pond Dam?
Hideaway Pond Dam has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Hideaway Pond Dam last inspected?
Hideaway Pond Dam was last inspected on April 26, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.