Henrich Pond Dam
Key Takeaway
Henrich Pond Dam is classified as significant hazard in New York. It was completed in 1960 and is 66 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 10 ft (taller than 12.4% in NY) |
| Dam Type | Earth |
| Max Storage | 10 acre-ft |
| Normal Storage | 8 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 35 cfs |
| Year Completed | 1960 (66 years old) |
| NID ID | NY13264 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
LENDER BRENDA & HARMONY G
Private
Nearby Dams
Lake Lucille Dam
Rockland, NY
High Hazard 13 ftGarnerville Dam
Rockland, NY
High Hazard 29 ftRockland Print CO Dam #2
Rockland, NY
Significant Hazard 15 ftLake Suzanne Dam
Rockland, NY
High Hazard 19 ftJohn Patrick Pond Dam
Rockland, NY
Significant Hazard 13 ftStony Point Dam
Rockland, NY
Significant Hazard 16 ftFirst Reservoir Dam
Rockland, NY
High Hazard 46 ftLake Deforest Dam
Rockland, NY
High Hazard 40 ftFrequently Asked Questions
What is the hazard classification of Henrich Pond Dam?
Henrich Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Henrich Pond Dam?
Henrich Pond Dam is owned by LENDER BRENDA & HARMONY G (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Henrich Pond Dam built?
Henrich Pond Dam was completed in 1960, making it 66 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Henrich Pond Dam?
Henrich Pond Dam serves the following purposes: Other, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Henrich Pond Dam?
Henrich Pond Dam has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Henrich Pond Dam last inspected?
Henrich Pond Dam was last inspected on June 25, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.