Hastings Power Dam is classified as significant hazard in New York. It was completed in 1920 and is 106 years old. Its primary use is hydroelectric. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 22 ft (taller than 63.7% in NY) |
| Dam Length | 125 ft |
| Dam Type | Concrete |
| Max Storage | 22 acre-ft |
| Normal Storage | 20 acre-ft |
| Surface Area | 3 acres |
| Year Completed | 1920 (106 years old) |
| NID ID | NY13734 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Troy Sand & Gravel Co. Inc.;Troy Sand & Gravel Co., Inc.
Private
Nearby Dams
Burden Lake Dam
Rensselaer, NY
Significant Hazard 24 ftFaith Mills Lower Dam
Rensselaer, NY
Significant Hazard 18 ftKane Dam
Rensselaer, NY
Significant Hazard 25 ftGlass Lake Dam
Rensselaer, NY
Significant Hazard 18 ftIda Lake Dam
Rensselaer, NY
Low Hazard 12 ftBurden Pond Dam
Rensselaer, NY
Low Hazard 17 ftRail Joint Mill Dam
Rensselaer, NY
Significant Hazard 25 ftBradley Lake Dam
Rensselaer, NY
High Hazard 50 ftFrequently Asked Questions
What is the hazard classification of Hastings Power Dam?
Hastings Power Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hastings Power Dam?
Hastings Power Dam is owned by Troy Sand & Gravel Co. Inc.;Troy Sand & Gravel Co., Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Hastings Power Dam built?
Hastings Power Dam was completed in 1920, making it 106 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Hastings Power Dam?
Hastings Power Dam serves the following purposes: Hydroelectric, Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Hastings Power Dam?
Hastings Power Dam has a dam height of 22 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Hastings Power Dam last inspected?
Hastings Power Dam was last inspected on December 13, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.