Hardwood Pond Dam
Key Takeaway
Hardwood Pond Dam is classified as low hazard in Texas. It was completed in 1900 and is 126 years old. Its primary use is water supply.
Physical Details
| Dam Height | 21 ft (taller than 38.8% in TX) |
| Dam Length | 1,250 ft |
| Dam Type | Earth |
| Max Storage | 218 acre-ft |
| Normal Storage | 116 acre-ft |
| Surface Area | 40 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 1900 (126 years old) |
| NID ID | TX05234 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WT CARTER AND BROS
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Hardwood Pond Dam?
Hardwood Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hardwood Pond Dam?
Hardwood Pond Dam is owned by WT CARTER AND BROS (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Hardwood Pond Dam built?
Hardwood Pond Dam was completed in 1900, making it 126 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Hardwood Pond Dam?
Hardwood Pond Dam serves the following purposes: Water Supply, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Hardwood Pond Dam?
Hardwood Pond Dam has a dam height of 21 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Hardwood Pond Dam last inspected?
Hardwood Pond Dam was last inspected on October 30, 1980. Inspection dates indicate when a formal review occurred, not the results of that inspection.