Griffin Lake Dam
Key Takeaway
Griffin Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 21 ft (taller than 43.5% in GA) |
| Dam Length | 726 ft |
| Dam Type | Earth |
| Max Storage | 369 acre-ft |
| Normal Storage | 239 acre-ft |
| Surface Area | 75 acres |
| Drainage Area | 0 sq mi |
| NID ID | GA06165 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Rose Land LP
Private
Nearby Dams
Taylor Lake Dam
Sumter, GA
Low Hazard 28 ftTaylor Lake Dam North
Sumter, GA
Low Hazard 17 ftColey Pond Dam
Dooly, GA
Low Hazard 20 ftBartenfield Lake Dam
Dooly, GA
Low Hazard 14 ftFrazier Lake Dam
Sumter, GA
Low Hazard 27 ftPace Lake Dam
Sumter, GA
Low Hazard 11 ftJeter Lake Dam
Dooly, GA
Low Hazard 12 ftJeter Farms Lake Dam
Dooly, GA
Low Hazard 23 ftFrequently Asked Questions
What is the hazard classification of Griffin Lake Dam?
Griffin Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Griffin Lake Dam?
Griffin Lake Dam is owned by Rose Land LP (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Griffin Lake Dam?
Griffin Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Griffin Lake Dam?
Griffin Lake Dam has a dam height of 21 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Griffin Lake Dam last inspected?
Griffin Lake Dam was last inspected on March 15, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.