Gosper Finish Lagoon 2 Dam
Key Takeaway
Gosper Finish Lagoon 2 Dam is classified as low hazard in Nebraska. It was completed in 2006 and is 20 years old. Its primary use is other.
Physical Details
| Dam Height | 14 ft (taller than 7.8% in NE) |
| Dam Length | 2,000 ft |
| Dam Type | Earth |
| Max Storage | 97 acre-ft |
| Normal Storage | 25 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 2006 (20 years old) |
| NID ID | NE02790 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Maschhoffs LLC
Private
Nearby Dams
Frontier County Finishers Lagoon Dam
Frontier, NE
Low Hazard 30 ftSayer Dam 3
Frontier, NE
Low Hazard 24 ftSayer Dam 2
Frontier, NE
Low Hazard 28 ftScott Dam 745
Gosper, NE
Low Hazard 14 ftRoad 731 County Dam
Frontier, NE
Low Hazard 14 ftFlammang Dam
Gosper, NE
Low Hazard 25 ftFarr Dam
Frontier, NE
Low Hazard 28 ftAndrews Dam 4054
Gosper, NE
Low Hazard 22 ftFrequently Asked Questions
What is the hazard classification of Gosper Finish Lagoon 2 Dam?
Gosper Finish Lagoon 2 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Gosper Finish Lagoon 2 Dam?
Gosper Finish Lagoon 2 Dam is owned by Maschhoffs LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Gosper Finish Lagoon 2 Dam built?
Gosper Finish Lagoon 2 Dam was completed in 2006, making it 20 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Gosper Finish Lagoon 2 Dam?
Gosper Finish Lagoon 2 Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Gosper Finish Lagoon 2 Dam?
Gosper Finish Lagoon 2 Dam has a dam height of 14 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Gosper Finish Lagoon 2 Dam last inspected?
Gosper Finish Lagoon 2 Dam was last inspected on June 28, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.