Gooding Odis
Key Takeaway
Gooding Odis is classified as low hazard in Oklahoma. It was completed in 1960 and is 66 years old. Its primary use is other.
Physical Details
| Dam Height | 20 ft (taller than 11.5% in OK) |
| Dam Length | 450 ft |
| Dam Type | Earth |
| Max Storage | 73 acre-ft |
| Normal Storage | 62 acre-ft |
| Max Discharge | 1,085 cfs |
| Year Completed | 1960 (66 years old) |
| NID ID | OK10714 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
KENNETH BYARS
Private
Nearby Dams
Goodine Odis
Choctaw, OK
Low Hazard 24 ftSCS-Carney Creek Site-1
Choctaw, OK
Low Hazard 30 ftPat Mayse Dam
Lamar, TX
High Hazard 96 ftHidden Lake Dam
Lamar, TX
Low Hazard 22 ftPine Creek WS SCS Site 17 Dam
Lamar, TX
High Hazard 35 ftPine Creek WS SCS Site 18 Dam
Lamar, TX
Low Hazard 27 ftPine Creek WS SCS Site 16 Dam
Lamar, TX
Low Hazard 35 ftStallings Lake Dam
Lamar, TX
Low Hazard 17 ftFrequently Asked Questions
What is the hazard classification of Gooding Odis?
Gooding Odis is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Gooding Odis?
Gooding Odis is owned by KENNETH BYARS (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Gooding Odis built?
Gooding Odis was completed in 1960, making it 66 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Gooding Odis?
Gooding Odis serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Gooding Odis?
Gooding Odis has a dam height of 20 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Gooding Odis last inspected?
Gooding Odis was last inspected on August 9, 1999. Inspection dates indicate when a formal review occurred, not the results of that inspection.