Goldco Operating Co

TR-CANADIAN RIVER· Cleveland, Oklahoma· Built 1960· Earth· 19 ft tall
High Hazard Other Private

Key Takeaway

Goldco Operating Co is classified as high hazard in Oklahoma. It was completed in 1960 and is 66 years old. Its primary use is other. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 19 ft (taller than 10.2% in OK)
Dam Length745 ft
Dam TypeEarth
Max Storage65 acre-ft
Normal Storage35 acre-ft
Surface Area11 acres
Max Discharge1,000 cfs
Year Completed1960 (66 years old)
NID IDOK12563

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: March 24, 2022
State Regulated: Yes
Regulatory Agency: OWRB

Ownership

CONTINENTAL 292 FUND LLC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Goldco Operating Co?

Goldco Operating Co is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Goldco Operating Co?

Goldco Operating Co is owned by CONTINENTAL 292 FUND LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Goldco Operating Co built?

Goldco Operating Co was completed in 1960, making it 66 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Goldco Operating Co?

Goldco Operating Co serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Goldco Operating Co?

Goldco Operating Co has a dam height of 19 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Goldco Operating Co last inspected?

Goldco Operating Co was last inspected on March 24, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.