Georgetown Plant Upper Supply Pond Dam is classified as significant hazard in Ohio. It was completed in 1948 and is 78 years old. Its primary use is water supply. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 10 ft (taller than 2.3% in OH) |
| Dam Length | 500 ft |
| Dam Type | Earth |
| Max Storage | 265 acre-ft |
| Normal Storage | 67 acre-ft |
| Surface Area | 11 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 60 cfs |
| Year Completed | 1948 (78 years old) |
| NID ID | OH00134 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Robert Shugert
Private
Nearby Dams
Upper Supply Dam
Harrison, OH
Low Hazard 10 ftGeorgetown Plant Lower Supply Pond Dam
Harrison, OH
Significant Hazard 45 ftGeorgetown Plant Freshwater Dam
Harrison, OH
High Hazard 73 ftCadiz Country Club Pond Dam
Harrison, OH
Significant Hazard 45 ftDickerson Slurry No. 3 Dam
Harrison, OH
Significant Hazard 54 ftGeorgetown Upper Pond No. 2 Dam
Harrison, OH
Low Hazard 22 ftSally Buffalo Park Lake Dam
Harrison, OH
High Hazard 37 ftSally Buffalo Park Lake No. 2 Dam
Harrison, OH
High Hazard 13 ftFrequently Asked Questions
What is the hazard classification of Georgetown Plant Upper Supply Pond Dam?
Georgetown Plant Upper Supply Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Georgetown Plant Upper Supply Pond Dam?
Georgetown Plant Upper Supply Pond Dam is owned by Robert Shugert (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Georgetown Plant Upper Supply Pond Dam built?
Georgetown Plant Upper Supply Pond Dam was completed in 1948, making it 78 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Georgetown Plant Upper Supply Pond Dam?
Georgetown Plant Upper Supply Pond Dam serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Georgetown Plant Upper Supply Pond Dam?
Georgetown Plant Upper Supply Pond Dam has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.