Franklin Impound No. 4 Dam

UNKNOWN· Washington, Georgia· Built 1992· Earth· 32 ft tall
Low Hazard Tailings Private

Key Takeaway

Franklin Impound No. 4 Dam is classified as low hazard in Georgia. It was completed in 1992 and is 34 years old. Its primary use is tailings.

Physical Details

Dam Height 32 ft (taller than 81% in GA)
Dam Length2,670 ft
Dam TypeEarth
Max Storage480 acre-ft
Surface Area29 acres
Drainage Area31 sq mi
Year Completed1992 (34 years old)
NID IDGA05239

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: January 1, 2003
State Regulated: No

Ownership

American Industrial Clay Corporation

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Franklin Impound No. 4 Dam?

Franklin Impound No. 4 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Franklin Impound No. 4 Dam?

Franklin Impound No. 4 Dam is owned by American Industrial Clay Corporation (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Franklin Impound No. 4 Dam built?

Franklin Impound No. 4 Dam was completed in 1992, making it 34 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Franklin Impound No. 4 Dam?

Franklin Impound No. 4 Dam serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Franklin Impound No. 4 Dam?

Franklin Impound No. 4 Dam has a dam height of 32 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Franklin Impound No. 4 Dam last inspected?

Franklin Impound No. 4 Dam was last inspected on January 1, 2003. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.