Fortner Pond Dam
Key Takeaway
Fortner Pond Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 9 ft (taller than 2.3% in GA) |
| Dam Length | 1,050 ft |
| Dam Type | Earth |
| Max Storage | 760 acre-ft |
| Surface Area | 85 acres |
| Drainage Area | 6,950 sq mi |
| NID ID | GA04678 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Mapp, Robert L.
Private
Nearby Dams
Josey Lake Dam
Johnson, GA
Low Hazard 13 ftMeeks Lake Dam
Johnson, GA
Low Hazard 17 ftWhittmer Pond Dam
Johnson, GA
Low Hazard 15 ftHarrison Lake Dam
Johnson, GA
Low Hazard 13 ftCecil Davis
Johnson, GA
Low Hazard 14 ftHarrison Pond Dam
Johnson, GA
Low Hazard 11 ftLager Irrigation Pond Dam
Johnson, GA
Low Hazard 12 ftRowland Lake Dam
Johnson, GA
Low Hazard 12 ftFrequently Asked Questions
What is the hazard classification of Fortner Pond Dam?
Fortner Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Fortner Pond Dam?
Fortner Pond Dam is owned by Mapp, Robert L. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Fortner Pond Dam?
Fortner Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Fortner Pond Dam?
Fortner Pond Dam has a dam height of 9 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Fortner Pond Dam last inspected?
Fortner Pond Dam was last inspected on March 13, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.