Engelhard Brannon # 2
Key Takeaway
Engelhard Brannon # 2 is classified as low hazard in Georgia.
Physical Details
| Dam Height | 55 ft (taller than 97.1% in GA) |
| Dam Length | 3,175 ft |
| Dam Type | Earth |
| Max Storage | 500 acre-ft |
| Normal Storage | 450 acre-ft |
| Surface Area | 25 acres |
| Drainage Area | 0 sq mi |
| NID ID | GA06985 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BASF Corp
Private
Nearby Dams
Ira Holliman Tailings Impoundment Dam
Wilkinson, GA
High Hazard 87 ftEngelhard Brannon # 1 Dam
Wilkinson, GA
High Hazard 68 ftEngelhard Trapnell # 3 Plant Tailings Pond
Wilkinson, GA
Low Hazard 50 ftCalvert Impoundment Dam
Wilkinson, GA
Unknown 60 ftEngelhard Trapnell # 2 Plant Tailings Impoundment
Wilkinson, GA
Low Hazard 40 ftEngelhard Trapnell # 1 Plant Tailings Pond
Wilkinson, GA
Low Hazard 23 ftBasf H3 Tailings Pond Dam
Wilkinson, GA
Unknown 41 ftEngelhard Trapnell # 1 A Plant Tailings Impoundment
Wilkinson, GA
Low Hazard 27 ftFrequently Asked Questions
What is the hazard classification of Engelhard Brannon # 2?
Engelhard Brannon # 2 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Engelhard Brannon # 2?
Engelhard Brannon # 2 is owned by BASF Corp (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
How tall is Engelhard Brannon # 2?
Engelhard Brannon # 2 has a dam height of 55 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Engelhard Brannon # 2 last inspected?
Engelhard Brannon # 2 was last inspected on January 1, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.