Ellis Pond Dam
Key Takeaway
Ellis Pond Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 15 ft (taller than 20.3% in GA) |
| Dam Length | 448 ft |
| Dam Type | Earth |
| Max Storage | 299 acre-ft |
| Normal Storage | 140 acre-ft |
| Surface Area | 30 acres |
| Drainage Area | 0 sq mi |
| NID ID | GA02110 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Sonny Burroughs
Private
Nearby Dams
Gordon Lake
Richmond, GA
High Hazard 9 ftBabcock Wilcox Lake Dam
Richmond, GA
Low Hazard 27 ftRhodes Pond Dam
Richmond, GA
Low Hazard 10 ftHills Lake Dam ( West )
Richmond, GA
Low Hazard 18 ftSoil Erosion Lake
Richmond, GA
Significant Hazard 33 ftLombard's Mill Pond Dam
Richmond, GA
Unknown 19 ftButler Reservoir
Richmond, GA
High Hazard 45 ftWoodlake Dam
Richmond, GA
Low Hazard 15 ftFrequently Asked Questions
What is the hazard classification of Ellis Pond Dam?
Ellis Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ellis Pond Dam?
Ellis Pond Dam is owned by Sonny Burroughs (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Ellis Pond Dam?
Ellis Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Ellis Pond Dam?
Ellis Pond Dam has a dam height of 15 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Ellis Pond Dam last inspected?
Ellis Pond Dam was last inspected on April 1, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.