Elliott Creek is classified as low hazard in Texas. It was completed in 1942 and is 84 years old. Its primary use is recreation.
Physical Details
| Dam Height | 44 ft (taller than 89.1% in TX) |
| Dam Length | 1,850 ft |
| Dam Type | Earth |
| Max Storage | 1.9K acre-ft |
| Normal Storage | 1.9K acre-ft |
| Surface Area | 260 acres |
| Drainage Area | 9 sq mi |
| Max Discharge | 15,584 cfs |
| Year Completed | 1942 (84 years old) |
| Year Modified | 1996 |
| NID ID | TX00363 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Red River Army Depot
Federal Government
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Elliott Creek?
Elliott Creek is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Elliott Creek?
Elliott Creek is owned by Red River Army Depot (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Elliott Creek built?
Elliott Creek was completed in 1942, making it 84 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Elliott Creek?
Elliott Creek serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Elliott Creek?
Elliott Creek has a dam height of 44 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Elliott Creek last inspected?
Elliott Creek was last inspected on October 15, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.