Effluent Equalization Basin Dam
Key Takeaway
Effluent Equalization Basin Dam is classified as low hazard in Georgia. It was completed in 1960 and is 66 years old. Its primary use is other.
Physical Details
| Dam Height | 31 ft (taller than 78.8% in GA) |
| Dam Length | 6,500 ft |
| Dam Type | Earth |
| Max Storage | 405 acre-ft |
| Normal Storage | 270 acre-ft |
| Surface Area | 45 acres |
| Drainage Area | 0 sq mi |
| Year Completed | 1960 (66 years old) |
| Year Modified | 2014 |
| NID ID | GA00733 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
International Paper Company - Rome Mill
Private
Nearby Dams
Ash Pond Dam
Floyd, GA
Low Hazard 19 ftGeorgia Kraft Ashpond Number 2 Dam
Floyd, GA
Low Hazard 36 ftSimpson Lake Dam
Floyd, GA
Low Hazard 24 ftGeorgia Power Plant Hammond Ash Pond #1 Dam
Floyd, GA
Low Hazard 25 ftGeorgia Power Plant Hammond Ash Pond Dam #3
Floyd, GA
Low Hazard 29 ftGeorgia Power Company Plant Hammond Ash Pond #2 Dam
Floyd, GA
Low Hazard 37 ftAsh Pond No. 4 Dam
Floyd, GA
Low Hazard 28 ftLane Lake Dam
Floyd, GA
Low Hazard 18 ftFrequently Asked Questions
What is the hazard classification of Effluent Equalization Basin Dam?
Effluent Equalization Basin Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Effluent Equalization Basin Dam?
Effluent Equalization Basin Dam is owned by International Paper Company - Rome Mill (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Effluent Equalization Basin Dam built?
Effluent Equalization Basin Dam was completed in 1960, making it 66 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Effluent Equalization Basin Dam?
Effluent Equalization Basin Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Effluent Equalization Basin Dam?
Effluent Equalization Basin Dam has a dam height of 31 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Effluent Equalization Basin Dam last inspected?
Effluent Equalization Basin Dam was last inspected on March 14, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.