Edison Wwt Lagoon
Key Takeaway
Edison Wwt Lagoon is classified as significant hazard in Ohio. It was completed in 2000 and is 26 years old. Its primary use is tailings. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 10 ft (taller than 2.3% in OH) |
| Dam Length | 3,540 ft |
| Dam Type | Earth |
| Max Storage | 108 acre-ft |
| Normal Storage | 72 acre-ft |
| Surface Area | 12 acres |
| Drainage Area | 0 sq mi |
| Year Completed | 2000 (26 years old) |
| NID ID | OH03017 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Village of Edison
Local Government
Nearby Dams
Mount Gilead Lower Lake Dam
Morrow, OH
High Hazard 33 ftDogwood Valley Camp Lake Dam
Morrow, OH
Low Hazard 26 ftHarding Area Council Bsa Dam
Morrow, OH
Low Hazard 31 ftStrait'S Lake Dam
Morrow, OH
Significant Hazard 24 ftLaurel Lake Dam
Morrow, OH
Significant Hazard 20 ftCandlewood Lake Dam
Morrow, OH
High Hazard 58 ftAshley Waterworks Reservoir
Delaware, OH
Significant Hazard 12 ftRogers Lake Dam
Morrow, OH
Significant Hazard 14 ftFrequently Asked Questions
What is the hazard classification of Edison Wwt Lagoon?
Edison Wwt Lagoon is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Edison Wwt Lagoon?
Edison Wwt Lagoon is owned by Village of Edison (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Edison Wwt Lagoon built?
Edison Wwt Lagoon was completed in 2000, making it 26 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Edison Wwt Lagoon?
Edison Wwt Lagoon serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Edison Wwt Lagoon?
Edison Wwt Lagoon has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Edison Wwt Lagoon last inspected?
Edison Wwt Lagoon was last inspected on October 30, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.