Dd No 153
Key Takeaway
Dd No 153 is classified as low hazard in Kansas. It was completed in 1977 and is 49 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 24 ft (taller than 41.9% in KS) |
| Dam Length | 1,400 ft |
| Dam Type | Earth |
| Max Storage | 203 acre-ft |
| Normal Storage | 30 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 1,851 cfs |
| Year Completed | 1977 (49 years old) |
| NID ID | KS03267 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WET WALNUT CREEK WJD NO 58
Local Government
Nearby Dams
Frd No 18
Rush, KS
Low Hazard 29 ftFrd No 20
Rush, KS
High Hazard 35 ftFrd No 19
Rush, KS
High Hazard 36 ftFrd No 17
Rush, KS
Significant Hazard 38 ftFrd No 21
Ness, KS
Low Hazard 23 ftFrd No 30
Rush, KS
Low Hazard 29 ftDam KS01701
Pawnee, KS
Low Hazard 29 ftDd No 2-18a
Pawnee, KS
Low Hazard 23 ftFrequently Asked Questions
What is the hazard classification of Dd No 153?
Dd No 153 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Dd No 153?
Dd No 153 is owned by WET WALNUT CREEK WJD NO 58 (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Dd No 153 built?
Dd No 153 was completed in 1977, making it 49 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Dd No 153?
Dd No 153 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Dd No 153?
Dd No 153 has a dam height of 24 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Dd No 153 last inspected?
Dd No 153 was last inspected on June 21, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.