Cushing Dam
Key Takeaway
Cushing Dam is classified as low hazard in Nebraska. It was completed in 1980 and is 46 years old. Its primary use is other.
Physical Details
| Dam Height | 23 ft (taller than 39.7% in NE) |
| Dam Length | 130 ft |
| Dam Type | Earth |
| Max Storage | 51 acre-ft |
| Normal Storage | 28 acre-ft |
| Surface Area | 2 acres |
| Drainage Area | 4 sq mi |
| Year Completed | 1980 (46 years old) |
| NID ID | NE07940 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Shannon S. Smith
Private
Nearby Dams
Keiser Farms Dam
Dundy, NE
Low Hazard 22 ftPetersen Dam 3753
Hitchcock, NE
Significant Hazard 17 ftKeiser Dam
Dundy, NE
Low Hazard 24 ftRhodes Dam
Hitchcock, NE
Low Hazard 12 ftGardner Dam 1153
Dundy, NE
Low Hazard 20 ftBelf Boevau Canyon Dam 1
Hitchcock, NE
Low Hazard 16 ftCarse Dam
Hitchcock, NE
Low Hazard 16 ftAnderson Dam 1152
Dundy, NE
Low Hazard 25 ftFrequently Asked Questions
What is the hazard classification of Cushing Dam?
Cushing Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cushing Dam?
Cushing Dam is owned by Shannon S. Smith (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cushing Dam built?
Cushing Dam was completed in 1980, making it 46 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cushing Dam?
Cushing Dam serves the following purposes: Other, Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cushing Dam?
Cushing Dam has a dam height of 23 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cushing Dam last inspected?
Cushing Dam was last inspected on July 25, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.