Creekside East Pond Dam

TR-CORONACA CREEK· Greenwood, South Carolina· Built 1985· 29 ft tall
High Hazard Recreation Private

Key Takeaway

Creekside East Pond Dam is classified as high hazard in South Carolina. It was completed in 1985 and is 41 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 29 ft (taller than 77.1% in SC)
Max Storage67 acre-ft
Normal Storage50 acre-ft
Surface Area6 acres
Year Completed1985 (41 years old)
NID IDSC02372

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: April 6, 2022
State Regulated: Yes
Regulatory Agency: SC DHEC

Ownership

CREEKSIDE HOMEOWNERS ASSOCIATION

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Creekside East Pond Dam?

Creekside East Pond Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Creekside East Pond Dam?

Creekside East Pond Dam is owned by CREEKSIDE HOMEOWNERS ASSOCIATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Creekside East Pond Dam built?

Creekside East Pond Dam was completed in 1985, making it 41 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Creekside East Pond Dam?

Creekside East Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Creekside East Pond Dam?

Creekside East Pond Dam has a dam height of 29 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Creekside East Pond Dam last inspected?

Creekside East Pond Dam was last inspected on April 6, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.