Country Pond Dam
Key Takeaway
Country Pond Dam is classified as unknown in New Hampshire. Its primary use is recreation.
Physical Details
| Dam Height | 6 ft (taller than 0.8% in NH) |
| Dam Length | 100 ft |
| Dam Type | Concrete |
| Max Storage | 280 acre-ft |
| Normal Storage | 222 acre-ft |
| Surface Area | 255 acres |
| Drainage Area | 14 sq mi |
| Max Discharge | 815 cfs |
| NID ID | NH02757 |
Safety Information
Hazard potential has not been determined.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Colby Brook Dam
Rockingham, NH
Low Hazard 11 ftPowwow Pond Dam
Rockingham, NH
Significant Hazard 12 ftBodwell Septage Facility Dam
Rockingham, NH
Significant Hazard 9 ftTuxbury Pond Dam
Essex, MA
Significant Hazard 10 ftDimond Pond Dam
Rockingham, NH
Unknown 12 ftExeter River Dam
Rockingham, NH
Significant Hazard 15 ftLake Attitash Dam
Essex, MA
Low Hazard 7 ftLittle Cub Pond Dam
Rockingham, NH
Low Hazard 11 ftFrequently Asked Questions
What is the hazard classification of Country Pond Dam?
Country Pond Dam is classified as Unknown. Hazard potential has not been determined. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Country Pond Dam?
Country Pond Dam is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Country Pond Dam?
Country Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Country Pond Dam?
Country Pond Dam has a dam height of 6 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Country Pond Dam last inspected?
Country Pond Dam was last inspected on July 26, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.