Key Takeaway
Bodwell Septage Facility Dam is classified as significant hazard in New Hampshire. It was completed in 2010 and is 16 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 9 ft (taller than 10.9% in NH) |
| Dam Length | 350 ft |
| Dam Type | Earth |
| Max Storage | 4 acre-ft |
| Normal Storage | 4 acre-ft |
| Surface Area | 1 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 2010 (16 years old) |
| NID ID | NH03734 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BIOLOGICAL RECYCLING COMPANY LLC
Private
Nearby Dams
Powwow Pond Dam
Rockingham, NH
Significant Hazard 12 ftPickpocket Dam
Rockingham, NH
High Hazard 15 ftCountry Pond Dam
Rockingham, NH
Unknown 6 ftExeter Sewage Holding Pond Dam
Rockingham, NH
Significant Hazard 10 ftTuxbury Pond Dam
Essex, MA
Significant Hazard 10 ftLake Attitash Dam
Essex, MA
Low Hazard 7 ftExeter Reservoir Dam
Rockingham, NH
High Hazard 15 ftExeter Sewage Lagoon Dam
Rockingham, NH
Significant Hazard 12 ftFrequently Asked Questions
What is the hazard classification of Bodwell Septage Facility Dam?
Bodwell Septage Facility Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bodwell Septage Facility Dam?
Bodwell Septage Facility Dam is owned by BIOLOGICAL RECYCLING COMPANY LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Bodwell Septage Facility Dam built?
Bodwell Septage Facility Dam was completed in 2010, making it 16 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Bodwell Septage Facility Dam?
Bodwell Septage Facility Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Bodwell Septage Facility Dam?
Bodwell Septage Facility Dam has a dam height of 9 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Bodwell Septage Facility Dam last inspected?
Bodwell Septage Facility Dam was last inspected on June 5, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.