Cool Spring Dam
Key Takeaway
Cool Spring Dam is classified as low hazard in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 24 ft (taller than 42.5% in VA) |
| Dam Type | Earth |
| Max Storage | 900 acre-ft |
| Drainage Area | 6 sq mi |
| NID ID | VA177016 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Wilderness/Presidential Resorts
Private
Nearby Dams
Chancellor West Dam
Spotsylvania, VA
Unknown 25 ftHazel Grove Dam
Spotsylvania, VA
Low Hazard 27 ftSawhill Dam
Spotsylvania, VA
Low Hazard 19 ftHidden Trail Lake
Spotsylvania, VA
Unknown 15 ftHunting Run Dam
Spotsylvania, VA
High Hazard 89 ftSpotsylvania County Dam #2
Spotsylvania, VA
Unknown 27 ftNi River Dam #1
Spotsylvania, VA
High Hazard 51 ftSpotsylvania County Dam #5
Spotsylvania, VA
Unknown 17 ftFrequently Asked Questions
What is the hazard classification of Cool Spring Dam?
Cool Spring Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cool Spring Dam?
Cool Spring Dam is owned by Wilderness/Presidential Resorts (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Cool Spring Dam?
Cool Spring Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cool Spring Dam?
Cool Spring Dam has a dam height of 24 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cool Spring Dam last inspected?
Cool Spring Dam was last inspected on August 11, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.