College Corner Upground Reservoir No. 2
Key Takeaway
College Corner Upground Reservoir No. 2 is classified as significant hazard in Ohio. It was completed in 1965 and is 61 years old. Its primary use is water supply. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 14 ft (taller than 9.6% in OH) |
| Dam Length | 1,986 ft |
| Dam Type | Earth |
| Max Storage | 58 acre-ft |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1965 (61 years old) |
| NID ID | OH02321 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Village of College Corner
Local Government
Nearby Dams
Four Mile Creek Site 14 Dam
Preble, OH
Low Hazard 22 ftFour Mile Creek Site 15 Dam
Preble, OH
Low Hazard 23 ftFour Mile Creek Site 10
Preble, OH
Significant Hazard 17 ftActon Lake Dam
Butler, OH
High Hazard 62 ftFour Mile Creek Site 9b Dam
Preble, OH
Low Hazard 29 ftLake Valhalla Dam
Preble, OH
Low Hazard 26 ftLake Lakengren Dam
Preble, OH
High Hazard 74 ftThor Lake Dam
Preble, OH
Low Hazard 39 ftFrequently Asked Questions
What is the hazard classification of College Corner Upground Reservoir No. 2?
College Corner Upground Reservoir No. 2 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates College Corner Upground Reservoir No. 2?
College Corner Upground Reservoir No. 2 is owned by Village of College Corner (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was College Corner Upground Reservoir No. 2 built?
College Corner Upground Reservoir No. 2 was completed in 1965, making it 61 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of College Corner Upground Reservoir No. 2?
College Corner Upground Reservoir No. 2 serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is College Corner Upground Reservoir No. 2?
College Corner Upground Reservoir No. 2 has a dam height of 14 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was College Corner Upground Reservoir No. 2 last inspected?
College Corner Upground Reservoir No. 2 was last inspected on May 17, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.