Key Takeaway

Clinch River Flyash Dam #1 is classified as high hazard in Virginia. Its primary use is other. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 55 ft (taller than 94.7% in VA)
Dam Length3,150 ft
Dam TypeRockfill
Max Storage1.2K acre-ft
Normal Storage1.2K acre-ft
Surface Area22 acres
Drainage Area0 sq mi
NID IDVA167003

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: October 11, 2022
State Regulated: Yes
Regulatory Agency: Department of Conservation and Recreation

Ownership

American Electric Power

Public Utility

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Clinch River Flyash Dam #1?

Clinch River Flyash Dam #1 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Clinch River Flyash Dam #1?

Clinch River Flyash Dam #1 is owned by American Electric Power (Public Utility). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

What is the primary purpose of Clinch River Flyash Dam #1?

Clinch River Flyash Dam #1 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Clinch River Flyash Dam #1?

Clinch River Flyash Dam #1 has a dam height of 55 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Clinch River Flyash Dam #1 last inspected?

Clinch River Flyash Dam #1 was last inspected on October 11, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.