Claudine Massey
Key Takeaway
Claudine Massey is classified as low hazard in Oklahoma. It was completed in 1960 and is 66 years old. Its primary use is other.
Physical Details
| Dam Height | 25 ft (taller than 29.9% in OK) |
| Dam Length | 575 ft |
| Dam Type | Earth |
| Max Storage | 150 acre-ft |
| Normal Storage | 40 acre-ft |
| Surface Area | 9 acres |
| Max Discharge | 5,260 cfs |
| Year Completed | 1960 (66 years old) |
| NID ID | OK13157 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
REBECCA A MOORE
Private
Nearby Dams
L. G. Ruckman & Etux
Caddo, OK
Low Hazard 28 ftBarger Dam
Caddo, OK
Low Hazard 24 ftRaymond Chambers
Caddo, OK
Low Hazard 26 ftRaymond Chambers
Caddo, OK
Low Hazard 26 ftWyatt Lb
Caddo, OK
Low Hazard 30 ftDam OK83668
Caddo, OK
Low Hazard 36 ftSCS-Sugar Creek Site-012
Caddo, OK
Low Hazard 34 ftNo Name
Caddo, OK
Low Hazard 25 ftFrequently Asked Questions
What is the hazard classification of Claudine Massey?
Claudine Massey is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Claudine Massey?
Claudine Massey is owned by REBECCA A MOORE (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Claudine Massey built?
Claudine Massey was completed in 1960, making it 66 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Claudine Massey?
Claudine Massey serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Claudine Massey?
Claudine Massey has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Claudine Massey last inspected?
Claudine Massey was last inspected on September 15, 2010. Inspection dates indicate when a formal review occurred, not the results of that inspection.