Chuquatonchee Watershed Structure 09 Dam is classified as low hazard in Mississippi. It was completed in 1973 and is 53 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 37 ft (taller than 96.8% in MS) |
| Dam Type | Earth |
| Max Storage | 366 acre-ft |
| Drainage Area | 1 sq mi |
| Year Completed | 1973 (53 years old) |
| NID ID | MS00309 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Local Government
Nearby Dams
Ms04608 Lake Dam
Chickasaw, MS
Low Hazard 24 ftMs04605 Lake Dam
Chickasaw, MS
Low Hazard 16 ftChuquatonchee Watershed Structure 10 Dam
Chickasaw, MS
Low Hazard 22 ftMs04687 Lake Dam
Chickasaw, MS
Low Hazard 12 ftChuquatonchee WS Str 07 Dam
Chickasaw, MS
High Hazard 43 ftMs04686 Lake Dam
Chickasaw, MS
Low Hazard 13 ftMs04606 Lake Dam
Chickasaw, MS
Low Hazard 16 ftMs04685 Lake Dam
Chickasaw, MS
Low Hazard 14 ftFrequently Asked Questions
What is the hazard classification of Chuquatonchee Watershed Structure 09 Dam?
Chuquatonchee Watershed Structure 09 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Chuquatonchee Watershed Structure 09 Dam?
Chuquatonchee Watershed Structure 09 Dam is owned by information not available (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Chuquatonchee Watershed Structure 09 Dam built?
Chuquatonchee Watershed Structure 09 Dam was completed in 1973, making it 53 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Chuquatonchee Watershed Structure 09 Dam?
Chuquatonchee Watershed Structure 09 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Chuquatonchee Watershed Structure 09 Dam?
Chuquatonchee Watershed Structure 09 Dam has a dam height of 37 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.