Choctaw Creek WS SCS Site 27 Dam

TR-MILL CREEK· Grayson, Texas· Built 1972· Earth· 43 ft tall
Significant Hazard Flood Risk Reduction Fire Protection Stock Or Small Fish Pond Local Government

Key Takeaway

Choctaw Creek WS SCS Site 27 Dam is classified as significant hazard in Texas. It was completed in 1972 and is 54 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Height 43 ft (taller than 88.2% in TX)
Dam Length1,110 ft
Dam TypeEarth
Max Storage681 acre-ft
Normal Storage86 acre-ft
Surface Area16 acres
Drainage Area1 sq mi
Max Discharge2 cfs
Year Completed1972 (54 years old)
NID IDTX02066

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: September 25, 2019
State Regulated: Yes
Regulatory Agency: TCEQ

Ownership

CHOCTAW WATERSHED WID;GRAYSON COUNTY COMMISSIONERS COURT;UPPER ELM RED SWCD

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Choctaw Creek WS SCS Site 27 Dam?

Choctaw Creek WS SCS Site 27 Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Choctaw Creek WS SCS Site 27 Dam?

Choctaw Creek WS SCS Site 27 Dam is owned by CHOCTAW WATERSHED WID;GRAYSON COUNTY COMMISSIONERS COURT;UPPER ELM RED SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Choctaw Creek WS SCS Site 27 Dam built?

Choctaw Creek WS SCS Site 27 Dam was completed in 1972, making it 54 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Choctaw Creek WS SCS Site 27 Dam?

Choctaw Creek WS SCS Site 27 Dam serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Choctaw Creek WS SCS Site 27 Dam?

Choctaw Creek WS SCS Site 27 Dam has a dam height of 43 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Choctaw Creek WS SCS Site 27 Dam last inspected?

Choctaw Creek WS SCS Site 27 Dam was last inspected on September 25, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.