Choccolocco Creek W/S Dam Site 3
Key Takeaway
Choccolocco Creek W/S Dam Site 3 is classified as significant hazard in Alabama. It was completed in 1969 and is 57 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 53 ft (taller than 94.7% in AL) |
| Dam Length | 415 ft |
| Dam Type | Earth |
| Max Storage | 934 acre-ft |
| Normal Storage | 30 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 3 sq mi |
| Max Discharge | 1,676 cfs |
| Year Completed | 1969 (57 years old) |
| NID ID | AL00908 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
JAMES M JORDAN
Private
Nearby Dams
Greenleaf - Choccolocco Site 2
Calhoun, AL
High Hazard 66 ftShelton
Calhoun, AL
Low HazardChoccolocco Creek W/S Dam Site 6
Calhoun, AL
High Hazard 91 ftHarper No 2
Calhoun, AL
Low HazardSweetwater Lake - Site 7
Cleburne, AL
High Hazard 74 ftCottaquilla
Calhoun, AL
Low HazardHigh Rock Lake - Site 24
Cleburne, AL
High Hazard 88 ftColeman Lake
Cleburne, AL
Low Hazard 32 ftFrequently Asked Questions
What is the hazard classification of Choccolocco Creek W/S Dam Site 3?
Choccolocco Creek W/S Dam Site 3 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Choccolocco Creek W/S Dam Site 3?
Choccolocco Creek W/S Dam Site 3 is owned by JAMES M JORDAN (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Choccolocco Creek W/S Dam Site 3 built?
Choccolocco Creek W/S Dam Site 3 was completed in 1969, making it 57 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Choccolocco Creek W/S Dam Site 3?
Choccolocco Creek W/S Dam Site 3 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Choccolocco Creek W/S Dam Site 3?
Choccolocco Creek W/S Dam Site 3 has a dam height of 53 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Choccolocco Creek W/S Dam Site 3 last inspected?
Choccolocco Creek W/S Dam Site 3 was last inspected on March 29, 1999. Inspection dates indicate when a formal review occurred, not the results of that inspection.