Chippewa Creek Structure V-C

TRIBUTARY TO STEELE DITCH· Wayne, Ohio· Built 1971· Earth· 28 ft tall
Significant Hazard Flood Risk Reduction Local Government

Key Takeaway

Chippewa Creek Structure V-C is classified as significant hazard in Ohio. It was completed in 1971 and is 55 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Height 28 ft (taller than 54.7% in OH)
Dam Length585 ft
Dam TypeEarth
Max Storage820 acre-ft
Normal Storage26 acre-ft
Surface Area9 acres
Drainage Area3 sq mi
Max Discharge3,231 cfs
Year Completed1971 (55 years old)
NID IDOH00729

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: June 11, 2020
State Regulated: Yes
Regulatory Agency: Department of Natural Resources

Ownership

MWCD, Chippewa Subdistrict

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Chippewa Creek Structure V-C?

Chippewa Creek Structure V-C is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Chippewa Creek Structure V-C?

Chippewa Creek Structure V-C is owned by MWCD, Chippewa Subdistrict (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Chippewa Creek Structure V-C built?

Chippewa Creek Structure V-C was completed in 1971, making it 55 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Chippewa Creek Structure V-C?

Chippewa Creek Structure V-C serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Chippewa Creek Structure V-C?

Chippewa Creek Structure V-C has a dam height of 28 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Chippewa Creek Structure V-C last inspected?

Chippewa Creek Structure V-C was last inspected on June 11, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.