Key Takeaway
Chiltipin-San Fernando Cks WS SCS Site 5 Dam is classified as low hazard in Texas. It was completed in 1981 and is 45 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 30 ft (taller than 67.1% in TX) |
| Dam Length | 5,960 ft |
| Dam Type | Earth |
| Max Storage | 9.7K acre-ft |
| Normal Storage | 196 acre-ft |
| Surface Area | 67 acres |
| Drainage Area | 20 sq mi |
| Year Completed | 1981 (45 years old) |
| NID ID | TX04907 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
JIM WELLS COUNTY COMMISSIONERS COURT;JIM WELLS COUNTY SWCD
Local Government
Nearby Dams
Chiltipin San Fernando Cks WS SCS Site 9 Dam
Jim Wells, TX
Low Hazard 18 ftChiltipin-San Fernando Cks WS SCS Site 4 Dam
Jim Wells, TX
Low Hazard 49 ftChiltipin San Fernando Cks WS SCS Site 7 Dam
Jim Wells, TX
Low Hazard 22 ftChiltipin San Fernando Cks WS SCS Site 8 Dam
Jim Wells, TX
Low Hazard 20 ftChiltipin San Fernando Cks WS SCS Site 1 Dam
Jim Wells, TX
High Hazard 25 ftLake Findley Dam
Jim Wells, TX
High Hazard 20 ftChiltipin San Fernando Cks WS SCS Site 6 Dam
Jim Wells, TX
Low Hazard 31 ftDiamond Shamrock Off - Channel Leree
Jim Wells, TX
Low Hazard 21 ftFrequently Asked Questions
What is the hazard classification of Chiltipin-San Fernando Cks WS SCS Site 5 Dam?
Chiltipin-San Fernando Cks WS SCS Site 5 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Chiltipin-San Fernando Cks WS SCS Site 5 Dam?
Chiltipin-San Fernando Cks WS SCS Site 5 Dam is owned by JIM WELLS COUNTY COMMISSIONERS COURT;JIM WELLS COUNTY SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Chiltipin-San Fernando Cks WS SCS Site 5 Dam built?
Chiltipin-San Fernando Cks WS SCS Site 5 Dam was completed in 1981, making it 45 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Chiltipin-San Fernando Cks WS SCS Site 5 Dam?
Chiltipin-San Fernando Cks WS SCS Site 5 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Chiltipin-San Fernando Cks WS SCS Site 5 Dam?
Chiltipin-San Fernando Cks WS SCS Site 5 Dam has a dam height of 30 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.