Cheaha Creek W/S Dam Site 3
Key Takeaway
Cheaha Creek W/S Dam Site 3 is classified as significant hazard in Alabama. It was completed in 1966 and is 60 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 46 ft (taller than 92.5% in AL) |
| Dam Length | 900 ft |
| Dam Type | Earth |
| Max Storage | 670 acre-ft |
| Normal Storage | 33 acre-ft |
| Surface Area | 7 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 1,810 cfs |
| Year Completed | 1966 (60 years old) |
| NID ID | AL01078 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TALLADEGA CO. COMMISSION
Local Government
Nearby Dams
Mary Lake
Talladega, AL
Low HazardLake Socapatoy
Talladega, AL
Low HazardMump Creek Reservior
Talladega, AL
High HazardCheaha Creek W/S Dam Site 2
Talladega, AL
High Hazard 23 ftElliott Lake
Talladega, AL
Low HazardTalladega Lake
Talladega, AL
Low HazardCheaha Creek W/S Dam Site 5
Talladega, AL
High Hazard 76 ftLake Robin
Talladega, AL
High HazardFrequently Asked Questions
What is the hazard classification of Cheaha Creek W/S Dam Site 3?
Cheaha Creek W/S Dam Site 3 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cheaha Creek W/S Dam Site 3?
Cheaha Creek W/S Dam Site 3 is owned by TALLADEGA CO. COMMISSION (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cheaha Creek W/S Dam Site 3 built?
Cheaha Creek W/S Dam Site 3 was completed in 1966, making it 60 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cheaha Creek W/S Dam Site 3?
Cheaha Creek W/S Dam Site 3 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cheaha Creek W/S Dam Site 3?
Cheaha Creek W/S Dam Site 3 has a dam height of 46 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cheaha Creek W/S Dam Site 3 last inspected?
Cheaha Creek W/S Dam Site 3 was last inspected on March 22, 2001. Inspection dates indicate when a formal review occurred, not the results of that inspection.