Cedar Creek WS SCS Site 92 Dam
Key Takeaway
Cedar Creek WS SCS Site 92 Dam is classified as high hazard in Texas. It was completed in 1971 and is 55 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 31 ft (taller than 70.6% in TX) |
| Dam Length | 2,475 ft |
| Dam Type | Earth |
| Max Storage | 3.1K acre-ft |
| Normal Storage | 101 acre-ft |
| Surface Area | 45 acres |
| Drainage Area | 4 sq mi |
| Max Discharge | 4,251 cfs |
| Year Completed | 1971 (55 years old) |
| NID ID | TX03346 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
KAUFMAN COUNTY;KAUFMAN VAN ZANDT ROCKWALL SWCD
Local Government
Nearby Dams
Cedar Creek WS SCS Site 94b Dam
Kaufman, TX
Low Hazard 20 ftCedar Creek WS SCS Site 94c Dam
Kaufman, TX
Low Hazard 19 ftGoettsche Lake Dam
Van Zandt, TX
Low Hazard 21 ftCedar Creek WS SCS Site 95a Dam
Kaufman, TX
High Hazard 45 ftCedar Creek WS SCS Site 87a Dam
Kaufman, TX
High Hazard 43 ftCedar Creek WS SCS Site 102 Dam
Van Zandt, TX
Low Hazard 22 ftCedar Creek WS SCS Site 101 Dam
Van Zandt, TX
High Hazard 33 ftWills Point Reservoir Dam
Van Zandt, TX
High Hazard 20 ftFrequently Asked Questions
What is the hazard classification of Cedar Creek WS SCS Site 92 Dam?
Cedar Creek WS SCS Site 92 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cedar Creek WS SCS Site 92 Dam?
Cedar Creek WS SCS Site 92 Dam is owned by KAUFMAN COUNTY;KAUFMAN VAN ZANDT ROCKWALL SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cedar Creek WS SCS Site 92 Dam built?
Cedar Creek WS SCS Site 92 Dam was completed in 1971, making it 55 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cedar Creek WS SCS Site 92 Dam?
Cedar Creek WS SCS Site 92 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cedar Creek WS SCS Site 92 Dam?
Cedar Creek WS SCS Site 92 Dam has a dam height of 31 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cedar Creek WS SCS Site 92 Dam last inspected?
Cedar Creek WS SCS Site 92 Dam was last inspected on December 7, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.