Cedar Creek WS SCS Site 77a Dam
Key Takeaway
Cedar Creek WS SCS Site 77a Dam is classified as significant hazard in Texas. It was completed in 1962 and is 64 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 21 ft (taller than 38.8% in TX) |
| Dam Length | 3,000 ft |
| Dam Type | Earth |
| Max Storage | 2.8K acre-ft |
| Normal Storage | 199 acre-ft |
| Surface Area | 59 acres |
| Drainage Area | 3 sq mi |
| Max Discharge | 1,930 cfs |
| Year Completed | 1962 (64 years old) |
| NID ID | TX03335 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
KAUFMAN COUNTY;KAUFMAN VAN ZANDT ROCKWALL SWCD
Local Government
Nearby Dams
Cedar Creek WS SCS Site 76 Dam
Kaufman, TX
Significant Hazard 20 ftCedar Creek WS SCS Site 61 Dam
Kaufman, TX
High Hazard 29 ftCedar Creek WS SCS Site 60 Dam
Kaufman, TX
High Hazard 33 ftCedar Creek WS SCS Site 122a Dam
Kaufman, TX
High Hazard 23 ftCedar Creek WS SCS Site 82 Dam
Kaufman, TX
Low Hazard 22 ftWest Lake Dam
Kaufman, TX
Low Hazard 26 ftCedar Creek WS SCS Site 85 Dam
Kaufman, TX
Low Hazard 25 ftCedar Creek WS SCS Site 83 Dam
Kaufman, TX
Low Hazard 22 ftFrequently Asked Questions
What is the hazard classification of Cedar Creek WS SCS Site 77a Dam?
Cedar Creek WS SCS Site 77a Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cedar Creek WS SCS Site 77a Dam?
Cedar Creek WS SCS Site 77a Dam is owned by KAUFMAN COUNTY;KAUFMAN VAN ZANDT ROCKWALL SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cedar Creek WS SCS Site 77a Dam built?
Cedar Creek WS SCS Site 77a Dam was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cedar Creek WS SCS Site 77a Dam?
Cedar Creek WS SCS Site 77a Dam serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cedar Creek WS SCS Site 77a Dam?
Cedar Creek WS SCS Site 77a Dam has a dam height of 21 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cedar Creek WS SCS Site 77a Dam last inspected?
Cedar Creek WS SCS Site 77a Dam was last inspected on January 13, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.