Key Takeaway
Cedar Creek WS SCS Site 47a Dam is classified as high hazard in Texas. It was completed in 1985 and is 41 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 21 ft (taller than 38.8% in TX) |
| Dam Length | 4,090 ft |
| Dam Type | Earth |
| Max Storage | 3.1K acre-ft |
| Normal Storage | 154 acre-ft |
| Surface Area | 51 acres |
| Drainage Area | 4 sq mi |
| Max Discharge | 1,381 cfs |
| Year Completed | 1985 (41 years old) |
| NID ID | TX06731 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CITY OF TERRELL;KAUFMAN COUNTY;KAUFMAN VAN ZANDT ROCKWALL SWCD
Local Government
Nearby Dams
Cedar Creek WS SCS Site 50c Dam
Kaufman, TX
Significant Hazard 26 ftCedar Creek WS SCS Site 46rev Dam
Kaufman, TX
Low Hazard 18 ftPorter Lake Dam
Kaufman, TX
High Hazard 16 ftTerrell Country Club Lake Dam
Kaufman, TX
Significant Hazard 16 ftTawakoni Balancing Reservoir Levee
Kaufman, TX
High Hazard 31 ftLangkop Dam
Kaufman, TX
Low Hazard 19 ftCedar Creek WS SCS Site 88 Dam
Kaufman, TX
Significant Hazard 22 ftCedar Creek WS SCS Site 89 Dam
Kaufman, TX
Significant Hazard 21 ftFrequently Asked Questions
What is the hazard classification of Cedar Creek WS SCS Site 47a Dam?
Cedar Creek WS SCS Site 47a Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cedar Creek WS SCS Site 47a Dam?
Cedar Creek WS SCS Site 47a Dam is owned by CITY OF TERRELL;KAUFMAN COUNTY;KAUFMAN VAN ZANDT ROCKWALL SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cedar Creek WS SCS Site 47a Dam built?
Cedar Creek WS SCS Site 47a Dam was completed in 1985, making it 41 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cedar Creek WS SCS Site 47a Dam?
Cedar Creek WS SCS Site 47a Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cedar Creek WS SCS Site 47a Dam?
Cedar Creek WS SCS Site 47a Dam has a dam height of 21 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cedar Creek WS SCS Site 47a Dam last inspected?
Cedar Creek WS SCS Site 47a Dam was last inspected on December 7, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.