Cedar Creek WS SCS Site 124 Dam
Key Takeaway
Cedar Creek WS SCS Site 124 Dam is classified as low hazard in Texas. It was completed in 1966 and is 60 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 22 ft (taller than 41.9% in TX) |
| Dam Length | 1,850 ft |
| Dam Type | Earth |
| Max Storage | 1.2K acre-ft |
| Normal Storage | 67 acre-ft |
| Surface Area | 29 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 2,960 cfs |
| Year Completed | 1966 (60 years old) |
| NID ID | TX02844 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
KAUFMAN VAN ZANDT ROCKWALL SWCD;VAN ZANDT COUNTY
Local Government
Nearby Dams
Cedar Creek WS SCS Site 123 Dam
Van Zandt, TX
Significant Hazard 30 ftCedar Creek WS SCS Site 126 Dam
Van Zandt, TX
Low Hazard 25 ftCotton Lake Dam
Van Zandt, TX
Significant Hazard 16 ftCedar Creek WS SCS Site 134 Dam
Van Zandt, TX
Significant Hazard 36 ftCedar Creek WS SCS Site 127 Dam
Van Zandt, TX
Low Hazard 23 ftCanton Old City Lake Dam
Van Zandt, TX
High Hazard 18 ftSpring Lake Dam
Van Zandt, TX
High Hazard 24 ftCedar Creek WS SCS Site 111f Dam
Van Zandt, TX
Low Hazard 27 ftFrequently Asked Questions
What is the hazard classification of Cedar Creek WS SCS Site 124 Dam?
Cedar Creek WS SCS Site 124 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cedar Creek WS SCS Site 124 Dam?
Cedar Creek WS SCS Site 124 Dam is owned by KAUFMAN VAN ZANDT ROCKWALL SWCD;VAN ZANDT COUNTY (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cedar Creek WS SCS Site 124 Dam built?
Cedar Creek WS SCS Site 124 Dam was completed in 1966, making it 60 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cedar Creek WS SCS Site 124 Dam?
Cedar Creek WS SCS Site 124 Dam serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cedar Creek WS SCS Site 124 Dam?
Cedar Creek WS SCS Site 124 Dam has a dam height of 22 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cedar Creek WS SCS Site 124 Dam last inspected?
Cedar Creek WS SCS Site 124 Dam was last inspected on May 17, 2006. Inspection dates indicate when a formal review occurred, not the results of that inspection.