Camp Sunrise
Key Takeaway
Camp Sunrise is classified as low hazard in Georgia. It was completed in 1984 and is 42 years old. Its primary use is recreation.
Physical Details
| Dam Height | 27 ft (taller than 65.9% in GA) |
| Dam Length | 165 ft |
| Dam Type | Earth |
| Max Storage | 119 acre-ft |
| Normal Storage | 84 acre-ft |
| Surface Area | 8 acres |
| Max Discharge | 84 cfs |
| Year Completed | 1984 (42 years old) |
| NID ID | GA04313 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Camp Sunrise, Inc.
Private
Nearby Dams
Stewart Farm Pond Dam
Gordon, GA
High Hazard 25 ftTakela Lake Dam
Gordon, GA
Low Hazard 17 ftSelf Lake Dam
Gordon, GA
Low Hazard 15 ftJarrett Lake Dam
Gordon, GA
Low Hazard 13 ftSallacoa Creek Watershed Structure No. 89
Gordon, GA
Low Hazard 35 ftSalacoa Creek W/S Str. #62 Dam
Gordon, GA
Low Hazard 31 ftSalacoa Creek W/S Str. #100 Dam
Gordon, GA
Low Hazard 51 ftShope Lake Dam
Gordon, GA
Low Hazard 23 ftFrequently Asked Questions
What is the hazard classification of Camp Sunrise?
Camp Sunrise is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Camp Sunrise?
Camp Sunrise is owned by Camp Sunrise, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Camp Sunrise built?
Camp Sunrise was completed in 1984, making it 42 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Camp Sunrise?
Camp Sunrise serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Camp Sunrise?
Camp Sunrise has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Camp Sunrise last inspected?
Camp Sunrise was last inspected on February 19, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.