Camp Pee Dee Pond 2 Dam
Key Takeaway
Camp Pee Dee Pond 2 Dam is classified as low hazard in South Carolina. It was completed in 1959 and is 67 years old. Its primary use is recreation.
Physical Details
| Dam Height | 16 ft (taller than 28.8% in SC) |
| Max Storage | 61 acre-ft |
| Normal Storage | 39 acre-ft |
| Surface Area | 8 acres |
| Year Completed | 1959 (67 years old) |
| NID ID | SC02077 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
PRESBYTERIAN OF NEW HARMONY TRUSTEES
Private
Nearby Dams
Camp Pee Dee Pond 1 Dam
Marlboro, SC
Low Hazard 17 ftCamp Sandyridge Pond Dam
Marlboro, SC
Significant Hazard 25 ftCamp Sandyridge Dam
Marlboro, SC
Significant Hazard 17 ftHaire Pond Dam
Marlboro, SC
Low Hazard 9 ftWillamette Industries Dam
Marlboro, SC
High Hazard 14 ftBullards Millpond Dam
Marlboro, SC
High Hazard 11 ftMcmeekin Pond Dam
Marlboro, SC
High Hazard 7 ftGrants Millpond Dam
Marlboro, SC
High Hazard 7 ftFrequently Asked Questions
What is the hazard classification of Camp Pee Dee Pond 2 Dam?
Camp Pee Dee Pond 2 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Camp Pee Dee Pond 2 Dam?
Camp Pee Dee Pond 2 Dam is owned by PRESBYTERIAN OF NEW HARMONY TRUSTEES (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Camp Pee Dee Pond 2 Dam built?
Camp Pee Dee Pond 2 Dam was completed in 1959, making it 67 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Camp Pee Dee Pond 2 Dam?
Camp Pee Dee Pond 2 Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Camp Pee Dee Pond 2 Dam?
Camp Pee Dee Pond 2 Dam has a dam height of 16 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Camp Pee Dee Pond 2 Dam last inspected?
Camp Pee Dee Pond 2 Dam was last inspected on November 7, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.